The goals for the development of integrity management
standards include integrity assessment for pipelines located
in high-consequence areas (HCA'S), integrating data,
assessment, periodic reassessment and improving the integrity
management systems within operating pipeline companies.
The development of a pipeline integrity program requires a well balanced
approach. The staff at EN Engineering has
managed and operated the assets of major gas transmission and
distribution companies for decades. EN Engineering's customers include gas
distribution and gas transmission companies, oil and liquid
petroleum facilities and industrial facilities.
EN Engineering is uniquely positioned to help you with your
pipeline integrity management program.
PROGRAM MANAGEMENT AND DEVELOPMENT
From the identification and analysis of HCA's to the written
documentation of your pipeline integrity procedures, EN Engineering can
help you to:
Identify High Consequence Areas (HCA's)
Gather, assess and integrate your data
Provide for corrosion surveys, external corrosion and internal corrosion direct assessment (ECDA
and ICDA) and metallurgical support
Conduct Risk Assessment - probability of failure and consequence of failure
Complete inspection - from internal tool inspection (ILI) to pressure testing
Provide support for your interface to regulatory agencies
Develop pipeline integrity plans, procedures and reports
Provide design and management for repairs and modifications
Provide mitigation options including design implementation and documentation
Provide program and system audits and reviews
EN Engineering has an extensive engineering and Design & Drafting team with
operational knowledge related to the requirements established by
the Department of Transportation (DOT). EN Engineering can smoothly and
efficiently produce pipeline alignment maps to aid in the identification
of applicable pipeline segments.
DATA GATHERING, REVIEW AND ASSESSMENT
A key element of the integrity management framework is the
integration of all pertinent information. Data resolution to a
common reference is required in order to determine where the risks
of an incident are the greatest, and to make prudent decisions for
assessing and reducing those risks.
EN Engineering's operational background offers seamless support to gather and
assess pipeline system data such as:
Pipe manufacture and method
Construction installation
methods
Soils and environmental records
Operational
data and trends
Bell-hole excavation/incident records
In-line inspection (ILI) records
Corrosion control & cathodic
protection records
Metallurgical experience
Field failure
Welding support
At EN Engineering, we have the expertise to evaluate cathodic protection and
corrosion control threats using methods such as:
Cathodic protection system analysis
Close interval survey
DC voltage gradient surveys
ECDA and ICDA assessment
surveys
Electromagnetic surveys
Soil resistivity
Environmental surveys
GPS surveys and reference
RISK ASSESSMENT
EN Engineering recognizes that risk assessments vary in scope and
complexity. Whether an assessment is made using your risk models
or EN Engineering's risk models, EN Engineering is there to provide support, analysis
and-most importantly-experienced subject matter experts.
PIPELINE INTEGRITY PLANS AND PROGRAMS
The EN Engineering team maintains the background and experience
necessary to address the challenges associated with the development
and maintenance of a pipeline system. This expertise is used
to develop programs designed to meet the performance-based
regulatory requirements imposed by federal and state pipeline
safety regulations. From training to record keeping, from
emergency response to compliance assurance programs, from
program review to system audit, EN Engineering is prepared to support
your needs.
DESIGN / MANAGEMENT FOR REPAIRS OR MODIFICATIONS
EN Engineering provides a full range of engineering and operational
support services to the pipeline industry. Our project managers,
engineers and support staff maintain the expertise and experience to
fully meet your needs.