Multi-year contract providing detailed design, material lists and permitting
applications for various 2-5 mile modules, for replacement of approximately
50 miles of cast iron main annually. Project is expected to run thru 2016.
Vectren Energy - Indiana and Ohio
Multi-year contract to providing detailed design, material lists and cost estimates
for replacement of approximately 100 miles of cast iron and bare steel main annually.
Project is a 20 year program expected to run thru 2028.
Nicor Gas, Storage Projects - Illinois
Providing detailed design, material specifications, and material lists for various
compressor station equipment, both new installations and revisions,
within the companys gas storage fields. The scope of the project included
gathering lines, station piping and miscellaneous compressor equipment
upgrades. A total of $5MM worth of capital projects have been designed
annually.
Nicor Gas, Public Improvements - Illinois
Provided detailed analysis and design of all capital improvement projects
since 2002. This includes reviewing conflicts and designing around pipeline
facilities state, city, and municipal projects. The scope of the projects ranges
from 36 transmission main to 2 PE distribution piping annually.
Nicor Gas, System Improvement Projects - Illinois
An on-going project providing detailed design and material specifications
ranging from transmission station interconnects to 2 distribution piping.
Nicor Gas, Distribution Main Replacement Projects - Illinois
Multi-year contract since 2002 providing all aspects of engineering design
for annual replacement of 20 miles of cast iron main.
Nicor Gas, Transmission Projects - Illinois
An on-going project providing preliminary engineering services, detailed
cost estimates, and engineering design for transmission pipeline projects.
Included in the project is design of new station facilities.
Nicor Gas, Regulator Station Replacements - Illinois
On-going project providing detailed design for various regulation facilities.
To date, over 12 vault regulator systems and the necessary piping
have been designed on an annual basis.
Washington Gas - Washington D.C.
Providing detailed design and material lists for various segments of cast iron
main replacement. This is an annual project running from 2005 through
2010. To date, 8 miles of main replacement projects have been completed.
Baltimore Gas and Electric - Maryland
Providing detailed design and material lists for various segments of
main replacement associated with road construction projects, new busness, and aging infrastructure. This is a project running from 2005 through 2010. To
date, 40 projects have been completed for a total of 15 miles of replacement
along with over 20 regulator station redesign projects.
Southwest Gas - Arizona
Provided preparation of all details for the replacement of 7,100 of 8
transmission line with 16 pipe along with the design of two valve nest
tie-in points. Also included was detailed profile views for the installation
of the main in an area of significant proposed grading.
Vectren Altra Energy Ethanol Plant - Indiana
Designed meter and regulation facilities for gas supply to an ethanol
plant. This included the design of dual 3 pilot operated regulation
runs and (2) 8 turbine meter runs along with the associated valving
and piping.
Nicor Gas Stepan Chemical Project - Illinois
Provided detailed design, material specifications, and material lists
along with detailed procedures for reactivation of 1,000 of 6 service
line serving a chemical plant. Also included was design of metering,
heating, and regulating facilities.
Nicor Gas - Barrington System Improvement - Illinois
Extensive project to provide detailed design and material lists for over
5 miles of 12 main replacement due to a public improvement project.
Public improvement construction changes resulted in numerous design
changes and adjustments.
Nicor Gas - Illinois
Designed the replacement of 400 of 22 mainline along a major highway.
The design required a detailed bore profile to assist the pipeline
contractor in avoiding existing utilities in area. The main is installed at a
depth of approximately 35 below the roadway.
Nicor Gas - Illinois
Provided detailed design, material specifications, and material list for
the installation of (2) 42 pig launcher receiver barrels at two separate
station locations. This involved preparing detailed bid packages, participating
in the bid and construction meetings, and resolving conflicts
during construction.
Nicor Gas - Illinois
Performed the engineering design for the relocate of an 8 distribution
main across the Fox River. The design involved directional drilling
through rock with an alternative design for open cutting if conditions
allowed. Project also included coordination of construction permit approvals
from the various agencies including the Army Corp of
Engineers, IEPA, Village of Batavia, and Park District.