MEXICO PIPELINE

Preliminary design and drafting for 109 miles of 20” pipeline. 5

 

KN ENERGY PIPELINE

Preliminary design and drafting for 150 miles of 24” pipeline in Wyoming and Colorado. 5

 

ALLIANCE PIPELINE METER STATION

Installation of a major pipeline interconnect consisting of seven 16” ultrasonic meters and related equipment. 5

 

NIPSCO PIPELINE

Installation of a 7.0 mile 30” O.D. pipeline. 5

 

VARIOUS GAS DELIVERY LATERALS

Pipelines and related meter and regulator stations for several electric generation plants. 5

 

VARIOUS CONTROL DELIVERY LATERALS

Design, programming and field testing on various control system and automation projects. 5

 

HORIZON PIPELINE

Install 28 miles of 36” pipeline, seven meter stations and revisions to existing compressor station. 5

 

HORIZON COMPRESSION

Install 9,700 h.p. turbine driven centrifugal compressor at an existing compressor station. 5

 

P&G

Install 11 miles of 6” pipe, 6” meter regulator station and dual 6” taps. 5

 

NGPL

Install 22,000 h.p. electric drive compressor unit in new building at existing station. 5

 

PGL & C CO.

Installation of 4.75 miles of 20”. 5

 

AMEREN

Install 4,200’ of 10” lateral, meter and regulator facilities. 5

 

NGPL

Install coolers at a compressor station. 5

  

GAS CONTROL SYSTEM UPGRADE

Designed  and implemented Intellution  Ifix SCADA software to replace Hewlett-Packard 1000 mainframe computer.  Maintained old strategies and developed new strategies for data collection and disbursement. 5

 

NICOR TROY GROVE STATION

Completed electrical installation of Allison compressor including end device and control panel. 5

 

NICOR STORAGE FIELDS

Designed and implemented Intellution SCADA systems.  Laid out architecture for all field  I/O specifications and hardware installations.  Implemented various protocol structures allowing for communications to field devices. 5

 

NGPL

Perform system design analysis for a major pipeline. 5

 

IOWA LINE

Install additional 5,500 HP compression, 147 miles of 30” pipe, meter/regulator facilities and dual 24” taps. 5

 

ARKOMA

Install 107 miles of 24” pipe, 8.3 miles of 30”pipe, 16,400 HP station, 4,400 HP compressor station, meter facilities and 24” taps. 5

 

AMARILLO UPGRADE

Install additional 11,000 HP and 16,000 HP compressor facilities, install 58 miles of 36” pipe, automate a compressor station and remove 15 miles of pipe. 5

 

A/G INTERCONNNECT

200 HP compressor station and 192 miles of 30” pipe. 5

 

CROSSROADS

Install 7.2 miles of 20” pipe, dual 10” meter/regulator facilities, 3,000 HP electric drive compressor for NIPSCO. 5

 

TRAILBLAZER

Install 5,000 HP electric drive centrifugal compressor station. 5

 

CAIRO / MT. SIMON

Install central dehydration unit in storage field. 5

 

INDECK ENERGY SERVICES

Project manager for a multi-million dollar power plant project from obtaining right-of-way to boring to open cut of six miles of 16” gas line to metering, cathodic protection and conducting the final inspection. 5

 

PDVSA-GAS, VENEZUELA

Conducted an analysis and evaluation of the design, construction, operation and maintenance procedures applied to the Anaco-Jose/Puerto La Cruz gas transmission lines.  Verified compliance to ASME B31.8 code and certified pipeline integrity of the gas transmission system. 5

 

ALLIANCE PIPELINE

Evaluation of cathodic protection potentials on transmission pipeline system. 5

 

LAKEHEAD PIPE LINE COMPANY

Project management for evaluation, design and installation of corrosion control systems for the Line 14 Project transmission pipeline system. 5

 

ROCKFORD LOOPING PROJECT

Installation of 2 miles of 12” 300 psig pipe to increase distribution system capacity. 5