MEXICO
PIPELINE
Preliminary design and
drafting for 109 miles of 20” pipeline.
5
KN
ENERGY PIPELINE
Preliminary design and
drafting for 150 miles of 24” pipeline in Wyoming and Colorado.
5
ALLIANCE
PIPELINE METER STATION
Installation of a major
pipeline interconnect consisting of seven 16” ultrasonic meters and related
equipment.
5
NIPSCO
PIPELINE
Installation of a 7.0 mile
30” O.D. pipeline.
5
VARIOUS
GAS DELIVERY LATERALS
Pipelines and related meter
and regulator stations for several electric generation plants.
5
VARIOUS
CONTROL DELIVERY LATERALS
Design, programming and field
testing on various control system and automation projects.
5
HORIZON
PIPELINE
Install 28 miles of 36”
pipeline, seven meter stations and revisions to existing compressor station.
5
HORIZON
COMPRESSION
Install 9,700 h.p. turbine
driven centrifugal compressor at an existing compressor station.
5
P&G
Install 11 miles of 6” pipe,
6” meter regulator station and dual 6” taps.
5
NGPL
Install 22,000 h.p. electric
drive compressor unit in new building at existing station.
5
PGL & C
CO.
Installation of 4.75 miles of
20”.
5
AMEREN
Install 4,200’ of 10”
lateral, meter and regulator facilities.
5
NGPL
Install coolers at a
compressor station.
5
GAS
CONTROL SYSTEM UPGRADE
Designed and implemented
Intellution Ifix SCADA software to replace Hewlett-Packard 1000 mainframe
computer. Maintained old strategies and developed new strategies for data
collection and disbursement.
5
NICOR
TROY GROVE STATION
Completed electrical
installation of Allison compressor including end device and control panel.
5
NICOR
STORAGE FIELDS
Designed and implemented
Intellution SCADA systems. Laid out architecture for all field I/O
specifications and hardware installations. Implemented various protocol
structures allowing for communications to field devices.
5
NGPL
Perform system design
analysis for a major pipeline.
5
IOWA
LINE
Install additional 5,500 HP
compression, 147 miles of 30” pipe, meter/regulator facilities and dual 24”
taps.
5
ARKOMA
Install 107 miles of 24”
pipe, 8.3 miles of 30”pipe, 16,400 HP station, 4,400 HP compressor station,
meter facilities and 24” taps.
5
AMARILLO
UPGRADE
Install additional 11,000 HP
and 16,000 HP compressor facilities, install 58 miles of 36” pipe, automate a
compressor station and remove 15 miles of pipe.
5
A/G
INTERCONNNECT
200 HP compressor station and
192 miles of 30” pipe.
5
CROSSROADS
Install 7.2 miles of 20”
pipe, dual 10” meter/regulator facilities, 3,000 HP electric drive compressor
for NIPSCO.
5
TRAILBLAZER
Install 5,000 HP electric
drive centrifugal compressor station.
5
CAIRO /
MT. SIMON
Install central dehydration
unit in storage field.
5
INDECK
ENERGY SERVICES
Project manager for a
multi-million dollar power plant project from obtaining right-of-way to boring
to open cut of six miles of 16” gas line to metering, cathodic protection and
conducting the final inspection.
5
PDVSA-GAS,
VENEZUELA
Conducted an analysis and
evaluation of the design, construction, operation and maintenance procedures
applied to the Anaco-Jose/Puerto La Cruz gas transmission lines. Verified
compliance to ASME B31.8 code and certified pipeline integrity of the gas
transmission system.
5
ALLIANCE
PIPELINE
Evaluation of cathodic
protection potentials on transmission pipeline system.
5
LAKEHEAD
PIPE LINE COMPANY
Project management for
evaluation, design and installation of corrosion control systems for the Line 14
Project transmission pipeline system.
5
ROCKFORD
LOOPING PROJECT
Installation of 2 miles of
12” 300 psig pipe to increase distribution system capacity.
5