ANR Pipeline,
Chester
(3600 PSL) and Charlton (4000 PSL) Storage Fields,
Michigan
Managed the design for the development of two high-pressure
storage fields (3,600 and 4,000 psi respectively). Each field had
its own grassroots 8,000 HP reciprocating engine-compressor
station with Joules-Thompson liquid handling facilities.
5
Nicor Gas,
Lake
Bloomington Storage,
Illinois
Performed the
detailed engineering design and project management of the addition
of one 4000 HP integral compressor station to a Nicor Gas storage
facility.
5
Nicor Gas, Troy
Grove Storage,
Illinois
Responsible for the layout, design, and installation of a
5,500 hp centrifugal compressor station. The project consisted of
the design and development of equipment specifications, controls &
automation, HVAC and other station facilities, performing
environmental analysis, applying and receiving all permits,
perform bid analysis, procurement of materials, manage all
contracts, contractors and overseeing field installation, testing
and commissioning.
5
Nicor Gas, Troy
Grove Storage,
Illinois
Performed the
detailed engineering design of the addition of a 15,000 horsepower
gas turbine driven centrifugal compressor unit to an existing gas
storage facility.
5
Natural Gas
Pipeline Company of America/KMI, Columbus Junction,
Iowa
Installation of
4,000 hp compressor-engine, dehydration, measurement, piping,
buildings and foundations.
5
Natural Gas
Pipeline Company of America/KMI, Longview, Texas
Addition of 14
foot diameter, 4” wall thickness, 960 psig glycol absorber,
reconcentrator, and related facilities.
5
Natural Gas
Pipeline Company of America/KMI, Iowa & Texas
Design
modifications and replacements of glycol dehydration
reconcentrator systems and related facilities at multiple
locations.
5
Natural Gas
Pipeline Company of America/KMI, St. Elmo, Illinois
Detailed design
and project management of the installation of an additional
Waukesha AT reciprocating compressor unit with gas cooling at an
existing natural gas storage facility.
5
Natural Gas
Pipeline Company of America/KMI, Markham, Texas
Compressor
pulsation bottle and piping replacement including thermal &
pulsation analysis.
5
Natural Gas
Pipeline Company of America/KMI, Herscher, Illinois
Installation of packaged steam boiler system with energy
conservation pressurized condensate return. Condensate system and
steam trap improvement program coordination and engineering at
this and other stations.
5
Natural Gas
Pipeline Company of America/KMI, Herscher, Illinois
Turbocharger upgrade on large integral compressor engine.
Turbine driven compressor control upgrades including fuel and
other modifications. Gas recovery system additions and water
separation & re-injection expansions.
5
Natural Gas
Pipeline Company of America/KMI, St. Elmo, Illinois
Design and bills of material for a waste water treatment
system, slug catcher, and field drip removal system for an
existing natural gas storage field.
5
Natural Gas
Pipeline Company of America/KMI, Columbus Junction,
Iowa
Design and
project management of the installation of wellhead dehydration
facilities at 21 individual wells at an existing natural gas
storage field.
5
Natural Gas
Pipeline Company of America/KMI, Sayre, Oklahoma
Detailed design
to revise and replace main inlet/outlet meters and regulators for
an existing underground natural gas storage facility.
5
Natural Gas
Pipeline Company of America/KMI, Herscher, Illinois
Detailed
engineering design and project management of the installation of
high pressure gas coolers at an existing natural gas storage
facility.
5
Natural Gas
Pipeline Company of America/KMI, Herscher, Illinois
Detailed
engineering design for the installation of pulsation
bottles for the flash gas compressor unit at an existing natural
gas storage facility.
5
Natural Gas
Pipeline Company of America/KMI, Sayre, Oklahoma
Preliminary
design of the relocation and modification of filter separators and
inlet scrubbers at an existing natural gas storage facility.
5
Dominion
Transmission
Facility,
Lewis
County,
West Virginia
Glycol
dehydration system review.
5
Natural Gas
Pipeline Company of America/KMI, System Wide
Station
Emergency Shutdown system upgrades.
Natural Gas
Pipeline Company of America/KMI, St. Elmo & Herscher, Illinois
Sulphur
dehydration system modifications including Stretford and Claus
processes.
5
Natural Gas
Pipeline Company of America/KMI, Longview, Texas
Instrument gas
system/reliability improvements for downhole shut-in systems.
5
Unocal,
Southeast Louisiana
Managed the
design and installation for the piping, tankage, and pipeline
interconnect to handle the liquids from the gas storage field and
gas plant.
5
Unocal, Moab, Utah
Managed the
design and installation for the piping, tankage and related truck
loading facilities to handle the condensate from the gas storage
field and gas plant.
5
Nicor Troy Grove Storage Field - Peak Day Study
Completed a flow
study of the station yard and gathering system piping to identify
restrictions and determine recommendations for optimizing flow
throughout the system on “peak” day.
5
Nicor Troy Grove Storage Field
Specified and
designed the gas conditioning equipment for an existing natural
gas storage facility including two dehydration towers (100-150
MMCFD, two regenerators (1.00 – 1.25 MM BTU/Hr) and two flare
systems.
5
Nicor Ancona / Pontiac Storage Fields
Designed eleven
water knockout separators for various wells throughout Nicor’s
gathering system. This included specifying the separators,
bidding the fabrication and designing the associated piping for
the project.
5
Nicor Ancona Storage Field
Analyzed the
Stretford process and designing equipment to replace the surge
tank, oxidizer and coalescer.
5
Nicor Ancona Storage Field
Specified and
designed a four stage 850,000 BTU/Hr fin fan after cooler.
5
Nicor Ancona Storage Field
Specified and
designed a new inlet coalescer for reciprocating compressor.
Nicor Lake Bloomington Storage Field
Designed a
system for collection of saline water from drips and wellhead
separators.
5
Northern Indiana Public Service Company (NIPSCO)
Royal Center Storage Field Simulation Study
Completed a
Geologic and Reservoir simulation model of the Mt.Simon sandstone
and Trenton dolomite Aquifer storage fields.
5
Northern Indiana Public Service Company (NIPSCO) Royal Center
Storage Field
Drilled several
wells both vertically and horizontally and worked on several wells
to maintain and improve reservoir performances.
5
Northern Indiana Public Service Company (NIPSCO) Royal Center
Storage Field
Replaced and
lined the Trenton gathering system to better operate the field
without interruptions.
5
Natural Gas Pipeline Company of America/KMI, Herscher, Illinois
Detailed
engineering design for the installation of wellhead vertical pig
launchers and main gathering line horizontal launcher and receiver
facilities.
5
Natural Gas Pipeline Company of America/KMI, Herscher, Illinois
Detailed
engineering design for the retirement of redwood gas coolers and
installation of high pressure gas coolers at an existing natural
gas storage facility.
5
Natural Gas Pipeline Company of America/KMI, St. Elmo, Illinois
Detailed
engineering design and project management of the installation of
gathering line integrity program consisting of metal loss
inspection of pipe laterals, pipe replacement, installation of
plastic liners inside pipe laterals and installation of pigging
facilities on main gathering pipelines.
5
Natural Gas Pipeline Company of America/KMI, Sayre, Oklahoma
Detailed
engineering design and project management of the installation of
gathering line integrity program consisting of metal loss
inspection of pipe laterals, pipe replacement, installation of
plastic liners inside pipe laterals and installation of pigging
facilities on main gathering pipelines.
5
Natural Gas Pipeline Company of America/KMI, St. Elmo, Illinois
Detailed
engineering design and project management of the installation of
additional line heater facilities and control valves and
instrumentation.
5
Natural Gas Pipeline Company of
America/KMI, Herscher, Illinois
Detailed
engineering design and project management of the installation of
main gathering line pigging facilities.
5